NTPC Green Energy: Company Announces Second Section Of 125 MW Bhadla Solar PV Project Is Now Operational

1 min read     Updated on 03 Feb 2026, 08:57 PM
scanx
Reviewed by
Shriram SScanX News Team
Overview

NTPC Green Energy Limited has successfully declared commercial operation of the second section of its 125 MW Bhadla Solar PV Project in Phalodi, Rajasthan. The project, operated by NTPC Renewable Energy Limited, received certification from Rajasthan Renewable Energy Corporation Limited and increased the company's total installed capacity from 8688.25 MW to 8813.25 MW.

31678026

*this image is generated using AI for illustrative purposes only.

NTPC Green Energy Limited has successfully declared commercial operation of the second section of its 125 MW capacity from the Bhadla Solar PV Project in Rajasthan. The announcement was made through a regulatory filing under Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, dated 3rd February, 2026.

Project Details and Certification

The commercial operation declaration covers the second part capacity of 125 MW from the larger 500 MW Bhadla Solar PV Project located in Phalodi, Rajasthan. The project is operated by NTPC Renewable Energy Limited, a wholly owned subsidiary of NTPC Green Energy Limited.

Parameter: Details
Project Capacity: 125 MW (second part of 500 MW project)
Location: Phalodi, Rajasthan
Operating Entity: NTPC Renewable Energy Limited
Commercial Operation Date: 31st January, 2026
Certification Authority: Rajasthan Renewable Energy Corporation Limited (RREC)
Certificate Date: 3rd February, 2026

Capacity Enhancement Impact

The addition of this 125 MW solar capacity represents a significant expansion in the company's renewable energy portfolio. The commercial operation of this project has resulted in a notable increase in the group's total installed capacity.

Capacity Metric: Before Addition After Addition Increase
Commercial Capacity: 8688.25 MW 8813.25 MW 125 MW

Regulatory Compliance

The announcement was made in compliance with regulatory requirements, specifically under Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. The disclosure was formally communicated to both major stock exchanges where the company is listed.

The regulatory filing was signed by Manish Kumar, Company Secretary & Compliance Officer, and submitted to the National Stock Exchange of India Limited and BSE Limited.

Strategic Significance

This commercial operation declaration marks another milestone in NTPC Green Energy Limited's renewable energy expansion strategy. The Bhadla Solar PV Project represents part of the company's broader commitment to increasing its renewable energy capacity and contributing to India's clean energy objectives.

NTPC Green Energy Commissions 210 MW Solar Project In Gujarat Under Regulation 30

1 min read     Updated on 30 Jan 2026, 09:06 PM
scanx
Reviewed by
Riya DScanX News Team
Overview

NTPC Green Energy Limited has declared commercial operation of 210 MW capacity from its Khavda-II Solar PV Project in Gujarat effective 01.02.2026. This represents the first phase of a 1200 MW project, increasing NTPC Green Energy Group's total installed capacity from 8478.25 MW to 8688.25 MW and NTPC group's total capacity to 87,665 MW.

31333016

*this image is generated using AI for illustrative purposes only.

NTPC Green Energy Limited has announced the commercial operation of a significant solar power project through an official regulatory disclosure. The company declared the commercial operation of 210 MW capacity from its Khavda-II Solar PV Project in Gujarat, effective from 00:00 hrs of 01.02.2026.

Project Details and Capacity Addition

The newly operational capacity represents the first part of a larger 1200 MW Khavda-II Solar PV Project located in Gujarat. The project is being developed and operated by NTPC Renewable Energy Limited, which is a wholly owned subsidiary of NTPC Green Energy Limited.

Parameter: Details
Project Name: Khavda-II Solar PV Project
Operational Capacity: 210 MW
Total Project Capacity: 1200 MW
Location: Gujarat
Commercial Operation Date: 01.02.2026
Operating Entity: NTPC Renewable Energy Limited

Impact on Group Capacity

The addition of this 210 MW capacity has resulted in a notable increase in both NTPC Green Energy Limited Group and the broader NTPC group's renewable energy portfolio. The commercial operation of this solar project has enhanced the overall installed capacity significantly.

Capacity Details: NTPC Green Energy Group NTPC Group
Previous Commercial Capacity: 8478.25 MW -
New Addition: 210 MW 210 MW
Updated Total Installed Capacity: 8688.25 MW 87,665 MW
Updated Commercial Capacity: - 86,585 MW

Regulatory Compliance and Disclosure

The announcement was made in compliance with Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. The disclosure was formally communicated to both the National Stock Exchange of India Limited and BSE Limited on 30.01.2026 by Company Secretary Manish Kumar.

The phased approach to the Khavda-II Solar PV Project demonstrates the company's systematic expansion strategy in the renewable energy sector. With 210 MW now commercially operational out of the total planned 1200 MW capacity, the project represents significant potential for future capacity additions as subsequent phases become operational.

More News on NTPC Green Energy