Ayana Renewable Wins 50 MW Wind Project in SECI Tender at ₹3.85/kWh
Ayana Renewable Power Private Limited, a wholly owned subsidiary of ONGC NTPC Green Private Limited — a 50:50 joint venture between NTPC Green Energy Limited and ONGC Green Limited — has won a 50 MW ISTS-connected wind power project under SECI-Tranche-XX at a tariff of ₹3.85/kWh, with the e-reverse auction concluding on July 15, 2026.

*this image is generated using AI for illustrative purposes only.
NTPC Green Energy Limited 's joint venture subsidiary, Ayana Renewable Power Private Limited (Ayana), a wholly owned subsidiary of ONGC NTPC Green Private Limited, has secured a 50 MW wind power project in a tender conducted by Solar Energy Corporation of India Limited (SECI). The project was awarded under the tariff-based competitive bidding process for setting up 2000 MW ISTS-connected wind power projects in India (SECI-Tranche-XX), with Ayana winning the capacity at a tariff of ₹3.85/kWh.
Project Award Details
The e-reverse auction was conducted by SECI to select wind power developers for the specified capacity. Ayana Renewable Power emerged as a successful bidder in compliance with the Request for Selection (RFS) conditions, with the auction process concluding on July 15, 2026. The following table summarizes the key details of the project award:
| Parameter: | Details |
|---|---|
| Project Capacity: | 50 MW |
| Tariff: | ₹3.85/kWh |
| Tender Name: | Selection of Wind Power Developers for Setting up of 2000 MW ISTS-connected Wind Power Projects in India under Tariff-Based Competitive Bidding (SECI-Tranche-XX) |
| Auction Date: | July 15, 2026 |
About the Joint Venture
ONGC NTPC Green Private Limited is a 50:50 joint venture between NTPC Green Energy Limited and ONGC Green Limited. The successful bid by Ayana Renewable Power adds to the renewable energy portfolio of the joint venture entity. The disclosure was made to the exchanges in accordance with Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, with the press release confirming the development issued on July 15, 2026.
Historical Stock Returns for NTPC Green Energy
| 1 Day | 5 Days | 1 Month | 6 Months | 1 Year | 5 Years |
|---|---|---|---|---|---|
| -1.34% | -3.03% | -6.05% | +2.18% | -16.64% | -24.95% |
How will the ₹3.85/kWh tariff impact the overall profitability of Ayana Renewable Power compared to previous SECI wind tranches?
What is the expected timeline for the financial closure and commercial operation date of this 50 MW project?
Will this win influence NTPC Green Energy and ONGC Green to increase their joint venture's capital expenditure for future wind energy bids?


































