HG Infra JV Receives Letter of Acceptance for Thane Metro Rail Project
H.G. Infra Engineering Limited's joint venture with Kalpataru Projects International has secured the Letter of Acceptance for the Thane Metro Rail Project, involving construction of a 20.53 km elevated metro viaduct. The project includes depot approach viaduct and special spans, with H.G. Infra holding 40% stake and Kalpataru Projects as lead member with 60% stake.

*this image is generated using AI for illustrative purposes only.
The joint venture between H.G. Infra Engineering Limited and Kalpataru Projects International Limited has received the Letter of Acceptance (LOA) from Maharashtra Metro Rail Corporation Limited for the Thane Metro Rail Project. The LOA was issued on December 10, 2025, marking a significant milestone for both infrastructure companies in the metropolitan transportation sector.
Project Specifications and Scope
The approved project involves the design and construction of an elevated metro viaduct spanning 20.53 kilometers between UG Ramp and Balkum Naka. The comprehensive scope includes depot approach viaduct and three special spans as part of the Thane Integral Ring Metro Project.
| Parameter: | Details |
|---|---|
| Viaduct Length: | 20.53 km |
| Route: | UG Ramp to Balkum Naka |
| Project Type: | Elevated Metro Viaduct |
| Special Features: | Depot Approach Viaduct + 3 Special Spans |
| LOA Date: | December 10, 2025 |
Joint Venture Partnership Structure
The strategic alliance demonstrates a well-structured partnership approach in executing large-scale metro rail infrastructure. Kalpataru Projects International Limited serves as the lead member, while H.G. Infra Engineering Limited contributes as the junior partner in this collaboration.
| Partner: | Stake Percentage | Role |
|---|---|---|
| Kalpataru Projects International: | 60% | Lead Member |
| H.G. Infra Engineering Limited: | 40% | Joint Venture Partner |
Regulatory Compliance and Disclosure
H.G. Infra Engineering Limited has fulfilled its regulatory obligations by informing stock exchanges about this development. The company notified both BSE Limited and National Stock Exchange of India Limited in compliance with Regulation 30 and other applicable provisions of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015.
Strategic Significance for Mumbai Metropolitan Region
The Thane Integral Ring Metro Project represents a crucial expansion of the Mumbai Metropolitan Region's public transportation infrastructure. This elevated metro viaduct will enhance connectivity between key areas in Thane, supporting the region's growing urbanization and transportation needs. The project's approval reinforces the joint venture partners' capabilities in delivering complex metropolitan transportation solutions.
Historical Stock Returns for G G Engineering
| 1 Day | 5 Days | 1 Month | 6 Months | 1 Year | 5 Years |
|---|---|---|---|---|---|
| +1.85% | 0.0% | -8.33% | +3.77% | -68.75% | -92.14% |




































