KPI Green Energy Installs First 'Make In India' 4.2MW Wind Turbine by Senvion India in South Gujarat
KPI Green Energy has become the first Indian company to install a 4.2 MW wind turbine generator (4.2M160) manufactured by Senvion India in South Gujarat under the 'Make In India' initiative. The turbine, part of the 4XM platform with a 160-metre rotor diameter and 140-metre hub height, features over 85% localisation and was included in the ALMM in December 2025, marking a key milestone in India's wind energy evolution.

*this image is generated using AI for illustrative purposes only.
KPI Green Energy has become the first company in India to install a 4.2 MW wind turbine generator (4.2M160) manufactured by Senvion India, marking a significant milestone in the adoption of next-generation wind technology under the 'Make In India' initiative. The turbine has been installed by KP Group in South Gujarat and is specifically engineered for Indian wind conditions and site requirements.
A Landmark in Indigenous Wind Energy Manufacturing
The 4.2M160 turbine is part of Senvion's new generation 4XM platform and is designed to maximise energy capture in low-to-medium wind regimes. With a rated capacity of 4.2 MW, a 160-metre rotor diameter, and a 140-metre hub height, the turbine's larger swept area, advanced control systems, and site-optimised design enable higher generation output, improved efficiency, and enhanced long-term value.
| Parameter: | Details |
|---|---|
| Turbine Model: | 4.2M160 |
| Rated Capacity: | 4.2 MW |
| Rotor Diameter: | 160 metres |
| Hub Height: | 140 metres |
| Manufacturer: | Senvion India |
| Platform: | 4XM |
| Installation Location: | South Gujarat |
| Local Manufacturing Content: | Over 85% |
| ALMM Inclusion: | December 2025 |
| Initiative: | Make In India |
| Distinction: | First Indian company to install this turbine model |
Significance of the 4XM Platform
The 4XM platform features a modular architecture enabling efficient transportation, faster installation, and streamlined commissioning, while also improving serviceability and operational reliability. Engineered and manufactured in India with over 85% localisation, the platform represents the next phase of India's wind energy evolution towards larger and more efficient turbines. The platform was included in the Approved List of Models and Manufacturers (ALMM) in December 2025, further validating its compliance with domestic manufacturing standards.
Leadership Statement
Commenting on the development, Dr. Faruk Patel, Chairman & Managing Director, said: "Being the first to install the 'Make in India' 4.2 MW M160 wind turbine in South Gujarat reinforces KP Group's commitment to adopting advanced, next-generation technologies that enhance generation efficiency, optimise lifecycle performance, and deliver long-term value. This milestone further strengthens our position as a trusted partner in executing scalable and high-performance renewable energy solutions, while contributing meaningfully to India's transition towards a cleaner and more sustainable energy future."
Advancing India's Renewable Energy Landscape
Established in 1994 by Dr. Faruk G. Patel, KP Group has grown into a multi-faceted conglomerate with core expertise in renewable energy, infrastructure, and innovation. The group has championed sustainability by spearheading transformative projects in wind, solar, hybrid energy, Battery Energy Storage System (BESS), and green hydrogen. The successful installation of the 4.2M160 turbine in South Gujarat underscores KPI Green Energy's role as a pioneer in India's renewable energy sector, positioning the company at the forefront of the country's wind energy expansion as domestic manufacturing capabilities increasingly match global standards.
Historical Stock Returns for KPI Green Energy
| 1 Day | 5 Days | 1 Month | 6 Months | 1 Year | 5 Years |
|---|---|---|---|---|---|
| +5.81% | +4.94% | +24.57% | -9.34% | +21.47% | +3,325.78% |
How might KPI Green Energy's first-mover advantage with the 4.2M160 turbine influence its project pipeline and capacity addition targets over the next 2-3 years?
Could the 85% localisation of the 4XM platform trigger competitive responses from other wind turbine manufacturers operating in India, potentially driving down costs industry-wide?
What impact will the ALMM inclusion of the 4XM platform have on government procurement policies and the eligibility of future KPI Green Energy projects for central subsidies or incentives?


































