Birla Corporation Commences Coal Mining Operations at Bikram Mine in Madhya Pradesh

1 min read     Updated on 24 Apr 2026, 05:15 AM
scanx
Reviewed by
Radhika SScanX News Team
AI Summary

Birla Corporation Limited commenced coal mining operations at its Bikram Coal Mine in Burhar, Shahdol, Madhya Pradesh on 23rd April, 2026 at 12.32 p.m. (IST). The mine has an annual production capacity of 9.44 Million Tonnes of thermal coal. The company disclosed this development under SEBI Regulation 30, highlighting the strategic expansion of its mining operations and strengthening its position in the thermal coal segment.

powered bylight_fuzz_icon
38533511

*this image is generated using AI for illustrative purposes only.

Birla Corporation Limited has officially commenced coal mining operations at its Bikram Coal Mine, marking a significant milestone in the company's mining operations. The commencement was announced through a regulatory filing under SEBI disclosure requirements.

Mining Operations Launch

The coal mining operations at Bikram Coal Mine began on 23rd April, 2026 at 12.32 p.m. (IST). The mine is strategically located in Burhar, Shahdol, Madhya Pradesh, adding to the company's operational footprint in the region.

Parameter: Details
Commencement Date: 23rd April, 2026
Commencement Time: 12.32 p.m. (IST)
Location: Burhar, Shahdol, Madhya Pradesh
Mine Name: Bikram Coal Mine
Annual Capacity: 9.44 Million Tonnes
Coal Type: Thermal Coal

Production Capacity

The Bikram Coal Mine has been designed with an annual production capacity of 9.44 Million Tonnes of thermal coal. This substantial capacity positions the facility as a significant contributor to the company's coal production operations and strengthens its position in the thermal coal segment.

Regulatory Compliance

The company made this disclosure pursuant to Regulation 30 of SEBI (Listing Obligations & Disclosure Requirements) Regulations, 2015. The information has been simultaneously uploaded on the company's official website at www.birlacorporation.com , ensuring transparency and compliance with regulatory requirements.

The commencement of operations at Bikram Coal Mine represents a strategic development for Birla Corporation Limited, expanding its mining capabilities and production capacity in the thermal coal sector.

Historical Stock Returns for Birla Corporation

1 Day5 Days1 Month6 Months1 Year5 Years
-3.65%-6.45%+12.81%-22.88%-17.66%+0.20%

How will the 9.44 million tonnes annual capacity from Bikram Coal Mine impact Birla Corporation's overall market share in India's thermal coal sector?

What are Birla Corporation's plans for additional coal mining acquisitions or expansions following the successful launch of Bikram Coal Mine?

How might the new coal production capacity affect Birla Corporation's cement manufacturing costs and competitive positioning?

Birla Corporation Issues Corrigendum on Bikram Coal Mine Production Capacity Details

1 min read     Updated on 24 Apr 2026, 02:47 AM
scanx
Reviewed by
Radhika SScanX News Team
AI Summary

Birla Corporation Limited issued a corrigendum correcting earlier information about its Bikram Coal Mine in Madhya Pradesh. The company clarified that 9.44 Million Tonnes represents extractable reserves, not annual production capacity as previously stated. The actual peak rated capacity is 0.36 Million Tonnes Per Annum (MTPA). The correction was filed under SEBI regulations to ensure accurate disclosure of operational specifications.

powered bylight_fuzz_icon
38524658

*this image is generated using AI for illustrative purposes only.

Birla Corporation Limited has issued a corrigendum to clarify important technical specifications regarding its Bikram Coal Mine operations. The company corrected an inadvertent error in its earlier communication about the mine's production capacity.

Correction in Production Capacity Data

The company clarified that the figure of 9.44 Million Tonnes, which was previously mentioned as the Annual Production Capacity, actually represents the Extractable Reserves of the Bikram Coal Mine. This correction addresses a significant misstatement in the mine's operational specifications.

Parameter Specification
Extractable Reserves 9.44 Million Tonnes
Peak Rated Capacity 0.36 Million Tonnes Per Annum (MTPA)
Location Burhar, Shahdol, Madhya Pradesh

Mine Operations Details

The Bikram Coal Mine has commenced operations at its location in Burhar, Shahdol, Madhya Pradesh. The peak rated capacity of the mine stands at 0.36 Million Tonnes Per Annum (MTPA), which represents the actual annual production capability of the facility.

Regulatory Compliance

Birla Corporation Limited filed this corrigendum under Regulation 30 and 51 of the Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015. The company has also uploaded this information on its official website at www.birlacorporation.com for stakeholder reference.

The correction ensures accurate disclosure of the mine's technical specifications to investors and regulatory authorities, maintaining transparency in operational reporting.

Historical Stock Returns for Birla Corporation

1 Day5 Days1 Month6 Months1 Year5 Years
-3.65%-6.45%+12.81%-22.88%-17.66%+0.20%

How will the significantly lower actual production capacity (0.36 MTPA vs initially stated 9.44 MT) impact Birla Corporation's coal supply commitments to its cement plants?

What is the expected mine life of Bikram Coal Mine given the 9.44 million tonnes of extractable reserves at 0.36 MTPA production rate?

Will Birla Corporation need to accelerate development of other coal blocks or increase external coal procurement to meet its cement manufacturing requirements?

More News on Birla Corporation

1 Year Returns:-17.66%