AERPACE Industries Activates Pune R&D Facility with Solar Production Ready for April 2026

2 min read     Updated on 20 Mar 2026, 11:40 AM
scanx
Reviewed by
Radhika SScanX News Team
AI Summary

AERPACE Industries completed the soft launch and full activation of its integrated Pune facility in Chakan Industrial Region, achieving complete operational readiness for solar panel manufacturing with 2,000 daily production capacity starting April 2026, while simultaneously advancing defence drone manufacturing infrastructure setup with equipment procurement and installation underway.

powered bylight_fuzz_icon
35532437

*this image is generated using AI for illustrative purposes only.

AERPACE Industries has successfully activated its integrated research and development and manufacturing facility in Chakan Industrial Region, Pune, marking a significant operational milestone. The company conducted a comprehensive soft launch event with strategic alignment sessions for all employees across verticals.

Facility Activation and Strategic Alignment

The Pune facility has transitioned from infrastructure readiness to full operational status. The soft launch event included an all-employee vision alignment session led by the management team, emphasizing the company's integrated ecosystem strategy.

Parameter: Details
Facility Location: Chakan Industrial Region, Pune
Current Status: Fully Operational
Event Type: Soft Launch with Employee Alignment
Strategic Focus: Multi-vertical Integration

The strategic session covered four key verticals: renewable energy solar manufacturing, defence drone ecosystem, sustainable transportation platforms, and proprietary software systems. This comprehensive approach ensures unified execution toward building a sustainable, self-sufficient transportation and defence ecosystem powered by advanced technologies and clean energy.

Solar Manufacturing Production Readiness

The solar panel manufacturing vertical has achieved complete operational readiness with all critical systems successfully installed and calibrated. The facility has completed mechanical installation, electrical integration, and system calibration phases.

Production Parameter: Status/Capacity
Daily Production Capacity: 2,000 solar panels
Commercial Production Start: First week of April 2026
Equipment Status: Fully Calibrated
Manufacturing Focus: Process Stabilization and Quality Validation

The production timeline indicates the company's transition into active manufacturing operations within the renewable energy segment, with initial focus on process stabilization, quality validation, and output optimization.

Defence Drone Manufacturing Infrastructure

The defence drone manufacturing setup has progressed significantly with infrastructure deployment actively underway. The company has initiated procurement of required machinery and equipment, with deliveries of key manufacturing systems commenced and installation in progress.

Development Area: Current Status
Equipment Procurement: Initiated
System Deliveries: Commenced
Installation Phase: In Progress
Manufacturing Scope: UAV Assembly and Integration

The facility will support comprehensive defence capabilities including UAV assembly and integration, subsystem manufacturing for flight control, propulsion and communication systems, plus testing, validation, and demonstration preparation.

Integrated Operational Capabilities

With full activation, the Pune facility now serves as a central execution hub supporting multiple operational verticals. The integrated capabilities encompass solar panel manufacturing, defence UAV assembly and integration, engineering testing and validation, R&D and product development activities, and demonstration programs for stakeholder engagement.

The company has entered a structured execution phase with immediate priorities focused on commencing solar panel production in April 2026 with scalable output capacity, completing drone manufacturing line installation and commissioning, and developing UAV platforms for domestic and international stakeholder demonstrations.

Historical Stock Returns for Aerpace Industries

1 Day5 Days1 Month6 Months1 Year5 Years
+1.99%-0.12%+3.37%+9.11%+4.11%+185.25%

What strategic partnerships or customer agreements does AERPACE plan to secure before commercial solar production begins in April 2026?

How will AERPACE compete with established players in India's solar manufacturing market given the current overcapacity concerns?

What regulatory approvals and certifications are required for AERPACE's defence drone systems to enter domestic and international markets?

Aerpace Industries Announces Resignation of Company Secretary Neha Mankame

1 min read     Updated on 28 Feb 2026, 08:05 PM
scanx
Reviewed by
Riya DScanX News Team
AI Summary

Aerpace Industries Limited announced the resignation of Company Secretary and Compliance Officer Ms. Neha Rajan Mankame, effective February 28, 2026. The resignation was disclosed to BSE under SEBI Listing Regulations, with Ms. Mankame citing better career prospects as the reason for departure. The company has fulfilled all regulatory disclosure requirements and will file necessary forms with relevant authorities.

powered bylight_fuzz_icon
33834921

*this image is generated using AI for illustrative purposes only.

Aerpace Industries Limited has announced the resignation of Ms. Neha Rajan Mankame from her position as Company Secretary and Compliance Officer. The resignation takes effect from the close of business hours on February 28, 2026, as communicated to BSE Limited under regulatory disclosure requirements.

Regulatory Disclosure Details

The company informed BSE Limited about the resignation pursuant to Regulation 30 of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. The announcement was signed by Milan Shah Bhupendra, Managing Director, and includes all required documentation as per regulatory guidelines.

Particulars Details
Reason for Change Resignation from Company Secretary and Compliance Officer position
Effective Date February 28, 2026 (close of business hours)
Regulatory Compliance SEBI Listing Regulations and Master Circular requirements
Documentation Resignation letter and regulatory annexures provided

Resignation Details

In her resignation letter dated February 28, 2026, Ms. Neha Rajan Mankame stated that she is resigning due to better career prospects. She specifically declared that there are no other material reasons for her resignation, providing clarity on the circumstances surrounding her departure.

The resignation letter expressed gratitude toward the Board of Directors for the opportunity to serve the company. Ms. Mankame requested the Board to accept her resignation and make necessary arrangements for filing required forms with the Registrar of Companies and providing intimation to stock exchanges.

Corporate Compliance

Aerpace Industries Limited, formerly known as Supremex Shine Steels Limited, has ensured full compliance with regulatory requirements regarding the resignation announcement. The company provided detailed information as required under SEBI Master Circular No. SEBI/HO/CFD-PoD2/CIR/P/0155 dated November 11, 2024.

The resignation represents a change in key managerial personnel, with the Company Secretary and Compliance Officer being designated as Key Managerial Personnel under regulatory frameworks. The company will need to make appropriate arrangements for the transition and appointment of a successor to fulfill these critical compliance functions.

Historical Stock Returns for Aerpace Industries

1 Day5 Days1 Month6 Months1 Year5 Years
+1.99%-0.12%+3.37%+9.11%+4.11%+185.25%

More News on Aerpace Industries

1 Year Returns:+4.11%