Aksharchem Solar Plant Operational Since November with GEDA Certification
AksharChem (India) has successfully commissioned a ground-mounted solar power plant with 5.19 MWP peak capacity and 3.85 MWP output capability, located at Village Makdala, Banaskantha. The facility has been operational since November 12, 2025, with the Gujarat Energy Development Agency (GEDA) Certificate of Commissioning received on December 09, 2025, supporting captive consumption at the company's Indrad factory.

*this image is generated using AI for illustrative purposes only.
AksharChem (India) has successfully commissioned a ground-mounted solar power plant, with operations commencing from November 12, 2025. The company received the Certificate of Commissioning from Gujarat Energy Development Agency (GEDA) on December 09, 2025, formally confirming the facility's operational status.
Solar Power Plant Specifications
The solar installation is strategically located at Village Makdala, Ta: Deodar, Dist. Banaskantha, designed for captive consumption at the company's factory located at Village Indrad (Chhatral).
| Parameter: | Specification |
|---|---|
| Peak Capacity (DC): | 5.19 MWP |
| Output Capacity (AC): | 3.85 MWP |
| Installation Type: | Ground-Mounted |
| Location: | Village Makdala, Banaskantha |
| Operational Date: | November 12, 2025 |
| GEDA Certification: | December 09, 2025 |
The ground-mounted configuration allows for optimal solar panel positioning and maintenance accessibility, crucial for sustained energy generation performance.
Strategic Development and Timeline
This solar power plant represents AksharChem (India)'s strategic entry into renewable energy infrastructure, complementing its established presence in the chemicals sector. The facility operates under a captive consumption model, directly supporting the company's manufacturing operations at its Indrad facility.
The company disclosed this development under Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, emphasizing its commitment to transparency in corporate communications.
Renewable Energy Portfolio Enhancement
The commissioning reflects the company's ongoing efforts to enhance its renewable energy portfolio and contribute to sustainable power generation initiatives. The dual capacity rating system provides clarity on both peak generation potential and practical output capabilities, ensuring operational efficiency for the chemical manufacturing processes.
Historical Stock Returns for AksharChem
| 1 Day | 5 Days | 1 Month | 6 Months | 1 Year | 5 Years |
|---|---|---|---|---|---|
| -2.22% | -3.81% | -4.85% | -3.13% | -20.15% | +4.16% |































