BHEL Expands Portfolio: DRDO Radome Production and Power Project Contract
BHEL has received technology transfer from DRDO for producing high-strength radomes at its Jagdishpur facility, expanding its defense manufacturing capabilities. Additionally, the company has accepted a Letter of Intent for a 1x800 MW Anuppur Thermal Power Project in Madhya Pradesh, valued at approximately ₹2,600.00 crore. The contract involves supplying supercritical technology equipment, including Boiler, Turbine, Generator, and associated auxiliaries, with a 58-month completion timeline.

*this image is generated using AI for illustrative purposes only.
Bharat Heavy Electricals Limited (BHEL), a leading Indian public sector engineering and manufacturing company, is making significant strides in diversifying its product portfolio and securing new contracts.
DRDO Transfers Radome Production to BHEL
The Defence Research and Development Organisation (DRDO) has handed over the production of high-strength radomes to BHEL's Jagdishpur facility. These radomes will serve as protective covers for missile sensors, highlighting BHEL's expanding role in India's defense manufacturing sector.
This transfer of technology from DRDO to BHEL underscores the government's push for indigenous defense production and the 'Make in India' initiative. The production of high-strength radomes at BHEL's facility is expected to enhance the company's capabilities in advanced materials and defense-related manufacturing.
Major Power Project Contract Secured
In a separate development, BHEL has recently accepted a Letter of Intent (LOI) from MB Power (Madhya Pradesh) Limited for a significant power project. The contract involves the supply of equipment for a 1x800 MW Anuppur Thermal Power Project in Madhya Pradesh.
Key details of the contract include:
Aspect | Detail |
---|---|
Project | 1x800 MW Anuppur Thermal Power Project |
Technology | Supercritical technology |
Scope | Supply of Boiler, Turbine, Generator, and associated auxiliaries |
Contract Value | Approximately ₹2,600.00 crore (excluding GST) |
Execution Timeline | 58 months for supply completion |
The boiler for this project will be manufactured at BHEL's Trichy plant, while the turbine generator will be produced at the Haridwar plant, showcasing BHEL's extensive manufacturing capabilities across its facilities.
Implications for BHEL
These developments signify BHEL's strong position in both the power and defense sectors:
- Diversification: The radome production transfer from DRDO demonstrates BHEL's ability to diversify into high-tech defense manufacturing.
- Core Competency: The power project contract reaffirms BHEL's expertise in large-scale power equipment manufacturing.
- Financial Boost: The ₹2,600.00 crore contract will contribute significantly to BHEL's order book and future revenue streams.
As BHEL continues to expand its portfolio and secure major contracts, it reinforces its position as a key player in India's industrial and defense landscape. The company's ability to handle diverse projects, from power generation equipment to advanced defense components, showcases its versatility and technological capabilities.
Historical Stock Returns for Bharat Heavy Electricals
1 Day | 5 Days | 1 Month | 6 Months | 1 Year | 5 Years |
---|---|---|---|---|---|
+0.60% | +2.09% | -14.46% | +8.31% | -22.37% | +452.30% |