Servotech Renewable Secures 1,415 KW Solar Rooftop Order From South Central Railway
Servotech Renewable Power System Ltd. has won a 1,415 KW solar rooftop project from South Central Railway's Vijayawada Division under Regulation 30 of SEBI LODR, covering design, engineering, supply, installation, testing, and commissioning of grid-connected systems across multiple railway sites, with execution required within 06 months of issue of the Letter of Award.

*this image is generated using AI for illustrative purposes only.
Servotech Renewable Power System Ltd. has secured a 1,415 KW solar rooftop project order from the Vijayawada Division of the South Central Railway, strengthening its growing engagement with Indian Railways and public infrastructure renewable energy projects. The order was disclosed pursuant to Regulation 30 of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, and was secured through a competitive bidding process, reflecting the company's capabilities in executing institutional and government-led renewable energy projects.
Contract Details
The following table summarizes the key parameters of the awarded contract:
| Parameter: | Details |
|---|---|
| Client: | South Central Railway (Vijayawada Division) |
| Project Type: | Solar Rooftop |
| Capacity: | 1,415 KW |
| Scope: | Design, engineering, supply, installation, testing, and commissioning |
| Sites: | Multiple railway sites under Vijayawada Division |
| Entity Type: | Domestic |
| Execution Timeline: | Within 06 months of issue of LOA |
| Related Party Transaction: | No |
Project Scope and Strategic Context
Under the scope of the project, Servotech Renewable will be responsible for the design, engineering, supply, installation, testing, and commissioning of grid-connected rooftop solar systems across multiple railway sites under the Vijayawada Division. The project aligns with Indian Railways' ongoing focus on accelerating renewable energy adoption and reducing carbon emissions through sustainable infrastructure development. Solar rooftop installations on railway premises are part of broader efforts by Indian Railways to transition toward cleaner energy sources, and this order adds to Servotech Renewable's execution pipeline in the solar power domain.
Management Commentary
Commenting on the order, Sarika Bhatia, Director, Servotech Renewable Power System Ltd., said, "We are pleased to strengthen our association with Indian Railways through this project with the Vijayawada Division. Such projects reflect the growing momentum towards clean energy integration across critical public infrastructure in India. We remain committed to delivering efficient, reliable, and high-performance solar solutions that support institutions in achieving their sustainability objectives while contributing to broader renewable energy adoption goals."
About Servotech Renewable Power System Limited
Servotech Renewable Power System Limited (formerly known as Servotech Power Systems Ltd.) is an NSE-listed organization that develops tech-enabled EV charging and renewable energy solutions, leveraging over two decades of experience in the electronics space. The company offers an integrated portfolio across DC chargers, solar inverters (Hybrid and GTI models), Battery Energy Storage Systems (BESS), and lithium-ion battery packs, serving multiple applications across commercial and domestic segments. With its comprehensive engineering capabilities, Servotech plays a pivotal role in developing India's renewable energy and EV technology infrastructure.
Historical Stock Returns for Servotech Renewable Power
| 1 Day | 5 Days | 1 Month | 6 Months | 1 Year | 5 Years |
|---|---|---|---|---|---|
| -0.90% | +0.13% | +34.50% | -18.32% | -19.27% | +4,426.19% |
How might Servotech Renewable's growing order book with Indian Railways translate into revenue visibility and margin improvement over the next 2-3 fiscal years?
Could this contract win position Servotech Renewable to bid for larger, zonal-level solar rooftop tenders as Indian Railways targets 20 GW of renewable energy capacity?
How will Servotech Renewable manage supply chain risks for solar components, particularly given global panel pricing volatility, within the 6-month execution timeline?


































