Sagar Cements commissions 1.55 MW WHRS at Gudipadu plant

1 min read     Updated on 25 Jun 2026, 03:17 AM
scanx
Reviewed by
Ashish TScanX News Team
AI Summary

Sagar Cements Limited commissioned the balance 1.55 MW Waste Heat Recovery Power System at its Gudipadu plant, bringing the total WHRS capacity to 4.35 MW. The move aims to enhance energy efficiency, optimise power costs, and support sustainability initiatives.

powered bylight_fuzz_icon
43840652

*this image is generated using AI for illustrative purposes only.

Sagar Cements Limited has successfully commissioned the balance capacity of 1.55 MW Waste Heat Recovery Power System (WHRS) at its cement manufacturing plant located in Gudipadu village, Ananthapur District, Andhra Pradesh. With this addition, the company's entire 4.35 MW WHRS capacity is now operational. The commissioning is expected to enhance energy efficiency, optimise power costs, and contribute towards sustainability initiatives in the manufacturing process.

Key Details of the WHRS Commissioning

The following table summarises the key parameters of the newly commissioned system and its impact on overall WHRS capacity:

Parameter: Details
New WHRS Capacity Commissioned: 1.55 MW
Facility Location: Gudipadu Plant, Ananthapur District
Total WHRS Capacity (Post-Addition): 4.35 MW
Expected Benefits: Enhanced energy efficiency and lower power costs

Operational and Strategic Significance

The commissioning of the 1.55 MW WHRS unit at the Gudipadu plant reflects Sagar Cements' focus on sustainable and cost-efficient manufacturing. Waste Heat Recovery Systems capture heat generated during the cement production process and convert it into usable electrical energy, thereby reducing dependence on external power sources. The expansion of WHRS capacity to 4.35 MW is expected to support the company's broader objective of optimising its energy expenditure.

Historical Stock Returns for Sagar Cements

1 Day5 Days1 Month6 Months1 Year5 Years
-1.02%-0.93%+3.94%-10.10%-26.62%-20.03%

How will the operationalization of the full 4.35 MW WHRS capacity impact Sagar Cements' quarterly power costs and profit margins?

Does Sagar Cements plan to replicate this waste heat recovery model at its other manufacturing facilities?

What are the company's future capital expenditure plans regarding further sustainability initiatives or green energy projects?

Sagar Cements promoter confirms no new encumbrances in FY26

1 min read     Updated on 20 Jun 2026, 07:29 AM
scanx
Reviewed by
Ashish TScanX News Team
AI Summary

Sagar Cements Limited promoter Dr. S. Anand Reddy disclosed to exchanges that no new encumbrances were created on promoter group shares in FY 2025-26, beyond those previously reported. The filing lists 20 individuals and entities within the promoter group.

powered bylight_fuzz_icon
43466344

*this image is generated using AI for illustrative purposes only.

Dr. S. Anand Reddy, a promoter of sagar cements , has confirmed that he and persons acting in concert have not created any new encumbrances on their shareholdings during the financial year 2025-26. The disclosure, submitted to the National Stock Exchange of India Ltd. and BSE Limited, states that no direct or indirect encumbrances were made other than those already disclosed. This regulatory filing was made in compliance with Regulation 31(4) of the SEBI (Substantial Acquisition of Shares and Takeovers) Regulations, 2011.

The declaration specifically addresses the status of shares held by the promoter group during FY 2025-26. It clarifies that while existing encumbrances remain valid, no additional pledges or charges were established on the shares throughout the period. The submission serves as a formal confirmation to the exchanges regarding the financial standing of the promoter's holdings.

Promoter and Promoter Group Details

The filing identifies the individuals and entities comprising the promoter group. The list includes key family members and associated companies. The table below outlines the members of the promoter and promoter group as disclosed in the regulatory filing.

Sl.No Name of the Promoter and Promoter Group
1 Dr. SAMMIDI ANAND REDDY
2 SREEKANTH REDDY SAMMIDI
3 SAMMIDI ARUNA
4 RACHANA SAMMIDI
5 MALATHI REDDY WDARU
6 MADHAVI NADIKATTU
7 P V NARSIMHA REDDY
8 SAMMIDI VANAJATHA
9 ANEESH REDDY SAMMIDI
10 SIDDARTH SAMMIDI
11 SAMMIDI NAINIKA REDDY
12 SAMMIDI SAHITHI
13 TELANGANA INDUSTRIAL DEVELOPMENT CORPORATION LIMITED
14 PANCHAVATI POLYFIBRES LTD
15 R V CONSULTING SERVICES PRIVATE LIMITED
16 SAGAR PRIYA HOUSING AND INDUSTRIAL ENTERPRISES LIMITED
17 SAGAR POWER LIMITED
18 SUPER HYDRO ELECTRIC PRIVATE LIMITED
19 SAGARSOFT (INDIA) LIMITED
20 ITCATS LLC DBA Infoway Software, USA

The disclosure was signed and submitted by Dr. S. Anand Reddy on April 6, 2026. The document provides transparency regarding the leverage status of the promoter's equity in the company.

Historical Stock Returns for Sagar Cements

1 Day5 Days1 Month6 Months1 Year5 Years
-1.02%-0.93%+3.94%-10.10%-26.62%-20.03%

How will the market interpret the stability in promoter encumbrances regarding Sagar Cements' future capital allocation strategy?

Does the absence of new pledges indicate a shift in the promoter group's approach to leveraging their holdings for expansion?

What impact will this disclosure have on investor confidence amidst potential volatility in the cement sector?

More News on Sagar Cements

Must Read Next

Earnings

Corporate Actions

Stocks

1 Year Returns:-26.62%