Niraj Cement Structurals Secures ₹46.52 Crore Railway Infrastructure Contract from Western Railway
Niraj Cement Structurals Limited has secured a ₹46.52 crore contract from Western Railway for comprehensive railway infrastructure development between Gandhidham and Adipur. The 18-month project involves quadrupling works, bridge construction, track laying, and platform development over 10 kilometers, including strategic connectivity to Mundra Port and Bhuj. This domestic contract represents a significant addition to the company's order book and showcases its expertise in large-scale railway infrastructure projects.

*this image is generated using AI for illustrative purposes only.
Niraj Cement Structurals Limited has announced the receipt of a major infrastructure contract worth ₹46.52 crores including GST from Western Railway. The company disclosed this development under Regulation 30 of SEBI (Listing Obligations and Disclosure Requirements) Regulation 2015 on January 09, 2026.
Contract Details and Scope
The comprehensive railway infrastructure project involves quadrupling works between Gandhidham (GIM) and Adipur (AI) stations, including a Y-connection at Adipur for direct entry towards Mundra Port and Bhuj. The contract encompasses a wide range of construction activities over a 10-kilometer stretch.
| Parameter: | Details |
|---|---|
| Contract Value: | ₹46.52 crores (including GST) |
| Awarding Authority: | Western Railway |
| Project Length: | 10 kilometers |
| Execution Timeline: | 18 months |
| Contract Type: | Domestic |
Project Components and Infrastructure Works
The contract includes execution of various specialized construction works essential for railway infrastructure development:
- Earthworks: Bank and cutting for formation including blanketing
- Bridge Construction: Major bridges, minor bridges with PSC slabs, and RCC box bridges
- Level Crossing Infrastructure: RUB/LHS in lieu of level crossings
- Building Structures: Platform construction and building infrastructure
- Protection Works: Stone pitching, toe walls, retaining walls, and side drains
- Track Infrastructure: Laying and linking of tracks with various permanent way related works
- Material Supply: Ballast supply and other incidental works
- Passenger Facilities: High-level passenger platform at Gopalpur
Strategic Significance
The project represents a significant infrastructure development initiative connecting key transportation hubs in Gujarat. The quadrupling between Gandhidham and Adipur, combined with the Y-connection providing direct access to Mundra Port and Bhuj, will enhance railway connectivity and freight movement capabilities in the region.
| Project Aspect: | Description |
|---|---|
| Route: | Gandhidham (GIM) - Adipur (AI) |
| Special Feature: | Y-connection at Adipur |
| Port Connectivity: | Direct entry to Mundra Port |
| Additional Connection: | Bhuj connectivity |
| Platform Enhancement: | High-level passenger platform at Gopalpur |
Regulatory Compliance
The company has fulfilled all disclosure requirements under SEBI regulations, confirming that the contract does not involve any related party transactions and that promoters have no interest in the awarding entity. The order represents a purely commercial engagement with Western Railway as a domestic entity.
This substantial contract addition strengthens Niraj Cement Structurals' position in the railway infrastructure sector and demonstrates the company's capability to handle complex, multi-faceted construction projects involving diverse engineering requirements.
Historical Stock Returns for Niraj Cement Structurals
| 1 Day | 5 Days | 1 Month | 6 Months | 1 Year | 5 Years |
|---|---|---|---|---|---|
| -3.85% | -10.58% | +4.27% | -32.68% | -44.99% | -23.00% |








































