HBL Engineering Secures Rs 24 Crore KAVACH Loco Equipment Order from ICF
HBL Engineering has secured a Rs 24 crore order (excluding 18% GST) from Integral Coach Factory (ICF), Chennai, for the supply, installation, testing, and commissioning of On-board KAVACH Loco equipment (Ver.4.0). The domestic contract, with no promoter or related party interest, is to be completed by March 31, 2028, and was disclosed under SEBI Listing Obligations and Disclosure Requirements Regulations, 2015.

*this image is generated using AI for illustrative purposes only.
HBL Engineering has secured a new order worth Rs 24 crores from Integral Coach Factory (ICF), Chennai for the supply, installation, testing, and commissioning of On-board KAVACH Loco equipment (Ver.4.0). The contract value excludes 18% GST and is scheduled for completion on or before March 31, 2028. The order was disclosed to the exchanges under Regulation 30 of the SEBI Listing Obligations and Disclosure Requirements Regulations, 2015.
The order is categorised as a domestic transaction and does not involve any interest from the promoters, promoter group, or group companies. The company confirmed that the transaction does not fall under the category of related party transactions. The disclosure was made in accordance with SEBI Master Circular No. SEBI/HO/CFD/PoD2/P/0155 dated November 11, 2024, read with a subsequent circular dated December 31, 2024.
Order Details
The following table outlines the key particulars of the order as disclosed:
| Particulars: | Details |
|---|---|
| Awarding Entity: | Integral Coach Factory (ICF), Chennai |
| Transaction Type: | Domestic |
| Scope of Work: | Supply, installation, testing and commissioning of On-board KAVACH Loco equipment (Ver.4.0) |
| Completion Timeline: | On or before March 31, 2028 |
| Contract Value: | Rs 24 crores (excluding 18% GST) |
| Promoter Interest: | None of the promoters is interested in the transaction |
| Related Party Transaction: | No |
The KAVACH system is an automatic train protection system designed to enhance safety on the rail network. This order reinforces HBL Engineering's engagement with the railway sector for safety-critical equipment.
Historical Stock Returns for HBL Engineering
| 1 Day | 5 Days | 1 Month | 6 Months | 1 Year | 5 Years |
|---|---|---|---|---|---|
| -2.26% | -4.13% | -12.85% | +1.05% | +19.47% | +1,180.50% |
How will this order impact HBL Engineering's revenue visibility and order book position for the upcoming fiscal years?
Does the completion timeline extending to 2028 indicate a phased rollout strategy for KAVACH Ver.4.0 across the Indian rail network?
What are the potential margin implications for the company given the long-term nature of the supply and installation contract?


































