RITES Limited Secures ₹45.19 Crore Bridge Consultancy Project from West Bengal
RITES Limited has won a significant infrastructure consultancy contract worth ₹45.19 crore from the West Bengal government for project management services of a 4-lane extra dosed bridge over river Muriganga. The 48-month project will connect Kachuberia on Sagar Island with Kakdwip, with RITES serving as Project Management Consultant and Authority Engineer for the entire lifecycle.

*this image is generated using AI for illustrative purposes only.
RITES Limited has announced securing a major infrastructure consultancy contract worth ₹45.19 crore from the Public Works (Roads) Directorate, Government of West Bengal. The contract represents a significant addition to the company's project portfolio in the eastern region and reinforces its position in India's infrastructure development sector.
Project Overview
The consultancy assignment involves comprehensive project management services for the construction of a 4-lane extra dosed bridge over river Muriganga. This critical infrastructure project will connect Kachuberia on Sagar Island with Kakdwip in the South 24 Parganas district, enhancing connectivity to the strategically important Sagar Island.
| Project Parameter: | Details |
|---|---|
| Contract Value: | ₹45.19 crore |
| Client: | Public Works (Roads) Directorate, Government of West Bengal |
| Project Duration: | 48 Months |
| Location: | South 24 Parganas district, West Bengal |
| Bridge Type: | 4-lane extra dosed bridge |
Scope of Services
RITES will serve as the Project Management Consultant and Authority Engineer for the entire project lifecycle. The company's responsibilities encompass the complete design and construction supervision of the proposed bridge infrastructure, including the approaches connecting the two locations.
Key Service Components:
- Entire design supervision and validation
- Construction supervision as Authority Engineer
- Project management consultancy services
- Quality assurance and compliance monitoring
- Technical oversight of bridge construction activities
Strategic Significance
This domestic contract demonstrates continued confidence in RITES' technical capabilities and project execution expertise. The project will enhance transportation connectivity between the mainland and Sagar Island, supporting regional economic development and improving access to this important geographical location in West Bengal.
The 48-month execution timeline indicates the comprehensive nature of the infrastructure development planned for this strategic corridor, positioning RITES as a key player in the region's connectivity enhancement initiatives.
Historical Stock Returns for RITES
| 1 Day | 5 Days | 1 Month | 6 Months | 1 Year | 5 Years |
|---|---|---|---|---|---|
| +2.35% | -4.18% | -7.15% | -21.19% | -1.31% | +58.96% |


































