Alkane FY26 production hits top half of guidance

scanx
Reviewed by
Suketu GScanX News Team
Key Highlights

Alkane Resources reported full-year production of 168,337 AuEq ounces for FY26, landing in the top half of its guidance range. The company's cash balance rose to $454 million, bolstered by strong quarterly sales of 47,411 AuEq ounces.

powered bylight_fuzz_icon
44846181

*this image is generated using AI for illustrative purposes only.

Alkane Resources has reported full-year production of 168,337 gold equivalent ounces (AuEq) for the period ending 30 June 2026, achieving the top half of its guidance range of 160,000 to 175,000 AuEq ounces. The company recorded a quarterly production of 42,491 AuEq ounces for the three months ended 30 June 2026. Alkane's cash, bullion, and listed investment balance totaled $454 million at the end of the quarter, representing a $104 million increase from the previous quarter and a $214 million increase from December 2025.

The company's three operating mines contributed to the consolidated output, with total gold production reaching 163,912 ounces and antimony production totaling 1,298 tonnes for the financial year. Alkane remains debt-free except for equipment finance of $17 million as of 30 June 2026. Pro forma liquidity stands at $549 million, including an undrawn $110 million revolving credit facility.

Production and Sales Summary

The following table details the production and sales figures for the Group for the quarter and year-to-date periods:

Mine Group Q4 (1 Apr – 30 Jun 2026) Group YTD (1 Jul – 30 June 2026)
Production
Tomingley 20,896 Au oz 82,973 Au oz
Costerfield 10,117 Au oz, 456 Sb t, 11,659 AuEq oz 40,103 Au oz, 1,298 Sb t, 44,527 AuEq oz
Björkdal 9,935 Au oz 40,837 Au oz
Consolidated 40,949 Au oz, 456 Sb t, 42,491 AuEq oz 163,912 Au oz, 1,298 Sb t, 168,337 AuEq oz
Sales
Consolidated 45,600 Au oz, 535 Sb t, 47,411 AuEq oz 165,196 Au oz, 1,364 Sb t, 169,827 AuEq oz

Operational Highlights

Alkane Managing Director & CEO, Nic Earner, stated that the company had another solid quarter of production from its three operating mines. He highlighted the continued balance sheet strengthening, noting the $454 million in cash, bullion, and listed investments at quarter end. During the quarter, the company filled hedging for 8,500 ounces of gold and made tax instalments of $16 million.

The merger with Mandalay Resources, which completed on 5 August 2025, influenced the basis for FY2026 statutory reporting. While Group YTD production reflects 100% contribution from Tomingley, Costerfield, and Björkdal, Alkane's statutory reported production for FY2026 reflects production from Costerfield and Björkdal only from the merger completion date. Attributable guidance for FY2026 was set at 155,000 to 168,000 AuEq ounces.

How does Alkane plan to utilize its significant liquidity balance of $454 million following the Mandalay Resources merger?

What are the production guidance targets for FY2027 now that the full-year integration of Costerfield and Björkdal is complete?

Will the company maintain its current hedging strategy, or does the strengthened cash position suggest a shift towards greater spot price exposure?

like19
dislike

Alkane Resources finds new mineralised zones at Boda-Kaiser

scanx
Reviewed by
Naman SScanX News Team
Key Highlights

Alkane Resources Limited reported significant exploration results from its Northern Molong Porphyry Project, including high-grade gold-copper intercepts at the Boda-Kaiser corridor and the identification of six new regional targets via geophysical surveys. Drilling at KAI226 returned 42.1m grading 0.16g/t Au and 0.14% Cu, while the Mobile Magnetotelluric survey defined new prospects at Driell Creek and Murga.

powered bylight_fuzz_icon
42628023

*this image is generated using AI for illustrative purposes only.

Alkane Resources Limited has announced significant exploration results from its Northern Molong Porphyry Project (NMPP) in New South Wales, revealing new mineralised zones and regional targets. The company reported that diamond core drilling at the Boda-Kaiser corridor intersected a magmatic root zone, with hole KAI226 returning 42.1m grading 0.16g/t Au and 0.14% Cu from 914m, including a higher-grade sub-interval of 4.8m grading 0.59g/t Au and 0.29% Cu. These results indicate the potential for further growth in the scale of the system.

Near Boda-Kaiser Exploration

The exploration program focused on testing the area between the Kaiser and Boda deposits, as well as targets northeast of Boda-Kaiser. Drilling at KAI226 intersected a mineralised monzodiorite cemented breccia, considered the likely magmatic root to overlying hydrothermal breccia mineralisation. Significant intercepts from this hole included 23.5m grading 0.17g/t Au and 0.14% Cu from 880.5m, including 3.2m grading 0.31g/t Au and 0.23% Cu. Further drilling is planned to test along strike and up-dip of this breccia.

At the northeast flank of the system, hole BOD168 intersected gold-enriched phyllic alteration, returning 9m grading 0.30g/t Au and 0.01% Cu from 264m. This alteration appears similar to that observed on the northeastern flank of the Boda deposit, and further drilling is planned to test for a deeper potassic core.

Regional Exploration and New Targets

District exploration included drilling at the Haddington and Glen Hollow prospects within the Comobella Intrusive Complex. At Haddington, hole HAD001 intersected monzonite and monzodiorite intrusives with gold-copper mineralisation, including 3m grading 1.74g/t Au and 0.07% Cu from 354m. However, drilling at Haddington and Glen Hollow highlighted that zones are either too small or of insufficient grade for current economic significance, with no immediate follow-up planned.

A Mobile Magnetotellurics (MMT) survey flown over the project area north of Boda-Kaiser defined six high-priority targets for porphyry style systems. These targets are located at Driell Creek, Murga, Gollan North, and two new prospects named One Tree and Old Station. Ground validation of these targets has commenced.

Significant Drilling Results

Hole ID Interval From (m) Interval To (m) Intercept (m) Au (g/t) Cu (%)
KAI226 880.5 904 23.5 0.17 0.14
KAI226 895.8 899 3.2 0.31 0.23
KAI226 914 956.1 42.1 0.16 0.14
KAI226 920 925 5 0.29 0.25
KAI226 948.2 953 4.8 0.32 0.29
BOD168 264 273 9 0.30 0.01
HAD001 354 357 3 1.74 0.07
HAD001 372 381 9 0.13 0.08

Planned Exploration

Alkane Managing Director & CEO Nic Earner stated that the results continue to add to the understanding of the Boda-Kaiser project, showing the scale potential of the system. Baseline environmental studies are underway for the Boda-Kaiser Project in parallel with scoping studies. Planned exploration over the next 12 months includes further drill testing of the Boda-Kaiser corridor area, targeting along strike and up-dip of KAI226. Regionally, work will recommence at Driell Creek, as well as testing the new targets generated by the MMT survey once validated.

What are the expected timelines for the completion of the scoping studies and baseline environmental assessments?

How might the identification of a magmatic root zone influence future resource estimates for the Boda-Kaiser corridor?

What criteria will determine whether the new regional targets identified by the MMT survey warrant further drilling investment?

like18
dislike