K.P. Energy Limited Secures 40.8 MW Wind-Solar Hybrid Power Project in Gujarat
K.P. Energy Limited has received a Letter of Award from Enerparc Energy Private Limited for developing a 40.8 MW wind-solar hybrid power project in Gujarat, comprising 20.2 MW wind and 20.6 MWp solar capacity. The turnkey project includes supply, installation, commissioning, evacuation infrastructure development, grid connectivity facilitation, and regulatory approvals. This award strengthens the company's position as an integrated renewable energy solutions provider and enhances its execution pipeline in the hybrid segment.

*this image is generated using AI for illustrative purposes only.
K.P. Energy Limited has secured a significant Letter of Award from Enerparc Energy Private Limited for developing a 40.8 MW wind-solar hybrid power project in Gujarat. The project represents a strategic addition to the company's renewable energy portfolio and reinforces its position as an integrated renewable energy solutions provider.
Project Specifications
The hybrid power project combines both wind and solar technologies to maximize energy generation efficiency. The project specifications demonstrate a balanced approach to renewable energy development:
| Component | Capacity |
|---|---|
| Wind Capacity | 20.2 MW |
| Solar Capacity | 20.6 MWp |
| Total Project Size | 40.8 MW |
| Location | Gujarat |
Comprehensive Turnkey Solution
The project has been awarded on a complete turnkey basis, encompassing multiple critical aspects of renewable energy development. K.P. Energy Limited will handle the entire project lifecycle from initial supply through final commissioning.
The comprehensive scope of work includes:
- Supply, installation and commissioning of the complete project
- Development of evacuation infrastructure
- Facilitation of grid connectivity
- Obtaining requisite statutory and regulatory approvals
Contract Details and Compliance
The Letter of Award from Enerparc Energy Private Limited, a domestic entity, follows all regulatory requirements under SEBI guidelines. The project execution timeline will adhere to the stipulations outlined in the Letter of Award.
| Parameter | Details |
|---|---|
| Awarding Entity | Enerparc Energy Private Limited |
| Entity Type | Domestic |
| Contract Nature | Letter of Award |
| Related Party Transaction | No |
| Promoter Interest | No |
Strategic Impact
This award further strengthens K.P. Energy Limited's position as an integrated renewable energy solutions provider and enhances its execution pipeline in the wind-solar hybrid segment. The hybrid approach allows for optimized energy generation by leveraging complementary generation patterns of wind and solar resources.
The company's expertise in handling complete turnkey projects positions it well to execute this comprehensive development, from initial infrastructure setup through final grid integration and regulatory compliance.
Historical Stock Returns for KP Energy
| 1 Day | 5 Days | 1 Month | 6 Months | 1 Year | 5 Years |
|---|---|---|---|---|---|
| -0.48% | -4.62% | -1.83% | -33.75% | -28.33% | -46.15% |


































