Trom Industries secures 10 MW solar order from South Bihar Power

1 min read     Updated on 21 Jun 2026, 05:13 PM
scanx
Reviewed by
Shriram SScanX News Team
AI Summary

Trom Industries received an order from South Bihar Power Distribution Company for 10 MW of grid-connected rooftop solar projects. The project covers 9,936 installations in the Aurangabad circle under the PM Surya Ghar Yojana. Supply is to be completed within nine months of signing the PPA.

powered bylight_fuzz_icon
43587777

*this image is generated using AI for illustrative purposes only.

Trom Industries has secured a purchase order from South Bihar Power Distribution Company to establish a cumulative capacity of 10 MW of grid-connected rooftop solar projects. The order involves setting up 9,936 consumer installations of 1.1 KW each in the Aurangabad circle under the CAPEX plus RESCO Mode Utility-Led Aggregation (ULA) Model of the PM Surya Ghar – Muft Bijli Yojana (PMSG-MBY).

Project Details

The project is classified as a domestic order and does not involve any related party transactions or promoter group interests. The execution timeline stipulates that the supply must be completed within nine months from the date of signing the Power Purchase Agreement (PPA).

Order Specifications

The following table outlines the key particulars of the order received:

Sr. No. Particulars Details
1 Name of client South Bihar Power Distribution Company Limited
2 Nature of order Setting up 10 MW of Grid-Connected Rooftop Solar Projects under CAPEX plus RESCO Mode Utility-Led Aggregation (ULA) Model of PM Surya Ghar – Muft Bijli Yojana (PMSG-MBY)
3 Scope 9,936 consumer installations of 1.1 KW each
4 Order type Domestic Order
5 Execution period Supply to be completed within 9 months from the day of issuance of signing of PPA
6 Aggregate order size 10 MW

The disclosure was made to the National Stock Exchange of India in compliance with Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015.

Historical Stock Returns for Trom Industries

1 Day5 Days1 Month6 Months1 Year5 Years
+4.77%+18.79%+13.78%-17.19%-42.12%-71.75%

How will this order impact Trom Industries' revenue and profitability in the upcoming fiscal year?

What are the potential challenges Trom Industries might face in meeting the nine-month execution timeline?

Could this order lead to further opportunities for Trom Industries under the PM Surya Ghar scheme?

Trom Industries wins 17 MW rooftop solar order from SBPDCL

1 min read     Updated on 18 Jun 2026, 09:15 AM
scanx
Reviewed by
Ashish TScanX News Team
AI Summary

Trom Industries secured a 17 MW order from South Bihar Power Distribution Company for 15,335 rooftop solar installations under the PM Surya Ghar Yojana. The project, located in the Bihar Sharif circle, must be completed within nine months of PPA signing. The order is domestic and does not involve related party transactions.

powered bylight_fuzz_icon
43299892

*this image is generated using AI for illustrative purposes only.

Trom Industries has secured a significant order from South Bihar Power Distribution Company Limited to establish 17 MW of grid-connected rooftop solar projects. The contract involves setting up 15,335 consumer installations of 1.1 KW each within the Bihar Sharif circle under the PM Surya Ghar – Muft Bijli Yojana. This initiative operates under the CAPEX plus RESCO Mode Utility-Led Aggregation (ULA) Model, aiming to expand solar energy access in the region.

The order was disclosed to the National Stock Exchange of India Limited under Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. The project is classified as a domestic order, with the aggregate order size confirmed at 17 MW. Trom Industries is responsible for the supply and execution of the rooftop solar infrastructure.

Execution timelines are strictly defined, with the supply required to be completed within nine months from the date of signing the Power Purchase Agreement (PPA). The company confirmed that the promoter group and group companies hold no interest in the entity awarding the order. Furthermore, the transaction does not fall under related party transactions.

Key Details of the Order

Particulars Details
Client South Bihar Power Distribution Company Limited
Project Capacity 17 MW
Consumer Installations 15,335 (1.1 KW each)
Location Bihar Sharif Circle, Bihar
Model CAPEX plus RESCO Mode Utility-Led Aggregation (ULA)
Scheme PM Surya Ghar – Muft Bijli Yojana (PMSG-MBY)
Execution Timeline Within 9 months from PPA signing

The project aligns with the government's push for residential solar adoption, leveraging a utility-led aggregation model to streamline implementation. This order marks a strategic expansion for Trom Industries in the renewable energy sector.

Historical Stock Returns for Trom Industries

1 Day5 Days1 Month6 Months1 Year5 Years
+4.77%+18.79%+13.78%-17.19%-42.12%-71.75%

How will this 17 MW order impact Trom Industries' revenue projections for the current fiscal year?

What are the potential challenges in meeting the strict nine-month execution timeline for 15,335 installations?

Could this successful implementation under the ULA Model lead to similar orders from other state power distribution companies?

More News on Trom Industries

1 Year Returns:-42.12%