Trident Resources starts 20,000m summer drill program at Contact Lake
Trident Resources has commenced a 20,000-metre summer drill program at the Contact Lake Gold Project in Saskatchewan, targeting expansion of high-grade gold mineralization. The program, running from June to November, is the largest exploration phase at the site in decades. Assays from the winter program and Preview SW deposit are pending.

*this image is generated using AI for illustrative purposes only.
Trident Resources has mobilized all geologic and drilling personnel and equipment to the Contact Lake Gold Project in Saskatchewan for the 2026 summer drill program. The company plans to drill over 20,000 metres in approximately 35 drillholes between June and November. This program represents the largest single exploration phase in many decades at Contact Lake and aims to expand the known gold mineralization both along strike and at depth.
The Contact Lake deposit remains open for expansion in all directions. The recently completed 2026 winter drill program successfully extended high-grade gold mineralization to the northeast at the BK3 zone. The summer program will focus on growing the resource base along strike to the west and at depth in multiple prospective target areas. Assays are still pending for seven holes from the winter program at the Contact Lake target area as well as eleven holes from the Preview SW deposit located 3km to the southeast.
Jon Wiesblatt, CEO of Trident Resources, stated that the project is emerging as one of the most exciting high-grade gold projects in Canada. He noted that mineralization is confirmed more than 500 metres below surface and the deposit remains open in all directions. The company believes it is only beginning to unlock the true scale of the system.
The Contact Lake Gold Project covers approximately 22,790 hectares and includes the past-producing Contact Lake gold mine. Historical production between 1994 to 1998 yielded approximately 190,000 ounces of gold at an average head grade of 6.16 g/t Au. The property hosts the Preview SW, Preview North, North Lake, and Greywacke North deposits, which are wholly-owned by Trident Resources.
Project Details
| Feature | Details |
|---|---|
| Location | Saskatchewan, Canada |
| Project Area | 22,790 hectares |
| Summer Drill Program | >20,000 metres, ~35 drillholes |
| Program Duration | June to November |
| Historical Production | ~190,000 ounces (6.16 g/t Au) |
Drill core is logged, photographed, and cut in half, with samples transported to ALS Global in Saskatoon for analysis. Gold is assayed using a 30g fire assay method. The technical information in the release has been reviewed and approved by Cornell McDowell, P.Geo., VP Exploration for Trident Resources and the Qualified Person as defined by NI 43-101.
Historical Stock Returns for Trident
| 1 Day | 5 Days | 1 Month | 6 Months | 1 Year | 5 Years |
|---|---|---|---|---|---|
| -1.23% | +6.10% | +8.40% | -2.11% | -12.27% | +59.34% |
How will the pending assay results from the winter program influence the targeting strategy for the upcoming summer drill campaign?
What are the implications for resource estimates if the high-grade mineralization is successfully extended to the west and at depth?
Could the expansion of the deposit lead to a re-evaluation of the economic viability of restarting the past-producing Contact Lake mine?































