Patel Engineering Wins ₹1,593 Crore Lower Arun Hydropower Contract in Nepal
Patel Engineering has secured a major contract worth ₹1,593.08 crores for Package 2 of the 669 MW Lower Arun Hydropower Project in Nepal. The 54-month project includes construction of tunnels, shafts, power house, and associated infrastructure in Sankhuwasabha District.

*this image is generated using AI for illustrative purposes only.
Patel Engineering has been declared the lowest bidder (L1) for Package 2 of the 669 MW Lower Arun Hydropower Project in Nepal, valued at ₹1,593.08 crores. The company announced this significant contract win through a regulatory filing under Regulation 30 of SEBI Listing Regulations.
Project Overview
The contract has been awarded by SJVN Lower Arun Power Development Company (P) Ltd., a wholly owned subsidiary of SJVN. The project details are outlined below:
| Parameter: | Details |
|---|---|
| Contract Value: | ₹1,593.08 crores (inclusive of VAT) |
| Project Capacity: | 669 MW |
| Location: | Sankhuwasabha District, Nepal |
| Execution Period: | 54 months |
| Package Type: | Civil and Hydro-mechanical Works |
Scope of Work
Package 2 encompasses critical infrastructure components for the Lower Arun Hydro-Electric Project. The comprehensive scope includes construction of Adit-5 and Adit-6 leading to the Head Race Tunnel, along with the Part Head Race Tunnel measuring 10.5 meters in diameter and extending 5.41 kilometers.
Additional work components cover the Surge Shaft and its gates, Pressure Shaft with Butterfly Valve Chamber and Access Adit, Power House, Switchyard, Surface Pothead Yard, and Tail Race Channel. The package also involves installation of steel liners for Pressure Shafts, Draft Tube Gates and hoists, plus associated road works and supporting infrastructure.
Management Commentary
Ms. Kavita Shirvairkar, Managing Director of Patel Engineering, commented on the development: "We are pleased to begin Q1 FY27 on a positive note, having been declared L1 for this important order of approximately ₹1600 crores. Nepal holds immense hydroelectric potential, and the Lower Arun project is a significant step toward harnessing that energy for sustainable growth."
She further added that with ongoing work at the Arun-3 Hydropower project located just 35 kilometers from the Lower Arun site, the company is well-positioned to deliver world-class engineering and timely execution.
Strategic Significance
The project site is strategically located near Tumlingtar in Sankhuwasabha District of Nepal, approximately 264 kilometers from Siliguri, India. This international contract reinforces Patel Engineering's capabilities in the hydropower sector and strengthens its presence in the regional infrastructure market.
Patel Engineering, established in 1949, has completed over 85 dams, 40 hydroelectric projects, and more than 300 kilometers of tunneling works. The company maintains a strong track record in executing projects for central PSUs and state government organizations across domestic and international markets.
Historical Stock Returns for Patel Engineering
| 1 Day | 5 Days | 1 Month | 6 Months | 1 Year | 5 Years |
|---|---|---|---|---|---|
| -2.67% | -2.12% | +17.32% | -22.56% | -34.27% | +172.91% |
How will the proximity of the Lower Arun project to Patel Engineering's existing Arun-3 Hydropower project create operational synergies and cost efficiencies?
What impact could this ₹1,593 crore contract have on Patel Engineering's revenue growth and order book strength over the next 4-5 years?
Will this project success position Patel Engineering to secure additional hydropower contracts in Nepal's untapped renewable energy market?


































